Added to comparisons. Check added properties.

Fortress Logistics Park Gdańsk offers high-class warehouse space, close to the southern bypass of the Tri-City.
The property is located in the vicinity of warehouse buildings with a similar purpose.
The hall area is dedicated to customers providing distribution services for both the local and domestic market. The location also provides convenient public transport for employees.

  • Modern Grade A warehouse designed for demanding tenants


  • Loading docks and ground-level access gates for efficient logistics operations


  • Clear height of 10 m, floor load capacity of 5 T/m²


  • Increased natural daylight through roof skylights


  • CCTV monitoring and 24/7 on-site security


  • On-site parking for trucks and passenger vehicles


  • Office and social space available, with fit-out options according to tenant requirements.

Location

Warehouse and logistics space located east of Gdańsk Excellent connection to key routes – close to roads No. 89, E77, and the "Gdańsk Port" junction Easy access to the S7 expressway (towards Warsaw) and A1 motorway Approx. 10 minutes to Gdańsk city center Approx. 27 km to Gdańsk Lech Wałęsa Airport Multifunctional investment – warehouse, light production, and office space available Attractive location within the Tri-City area, providing access to a well-qualified workforce Convenient access for employees, customers, as well as delivery vans and trucks

Technical data

  • The total count of buildings within the park
    2
  • The ability to oversee production
    YES
  • Certificate
    YES
  • Storage height (m)
    12
  • Floor loading capacity
    7
  • Column grid
    12x22,5 i 22,5 x24
  • Railway siding
    YES
  • Office Space Available
    NO
  • Fire resistance
     >4000
  • Docks
    YES
  • Ground-level entrance gates
    YES
  • Cold storage/freezer
    NO
  • Office space (sq m)
    -
  • Minimum office space (sq m)
    2500
  • Skylights
    YES
  • Sprinklers
    YES
  • Monitoring
    YES
  • Security
    YES
  • Offer ID
    mp11725

Developer

Panattoni Park Tricity East V is an investment developed by the developer Panattoni Europe. The company is one of the leading and most active investors on the Polish market. The warehouses for lease offered in the Panattoni portfolio are top-class technological solutions in convenient locations. Panattoni Europe's clients include international corporations as well as large and medium-sized regional companies.

Distances

Węzeł Gdańsk Port S7/DK89
Obwodnica Trójmiasta S7/S6
Port Lotniczy Gdańsk im. Lecha Wałęsy
Baltic Hub

Market data

The Gdańsk and Gdynia location (the Tri-City region including the tourist city of Sopot), serves as the logistics base for northern Poland. The region benefits from its proximity to seaports and cargo terminals, while its warehouse space supports logistics operators, retailers and manufacturing companies.

At the end of June 2026, the total stock of modern warehouse and production space in Pomorskie Voivodeship stood at 1.96 million sq m, while gross take-up reached 118,000 sq m. Tenant activity took place in a market supporting both regional distribution and port-related cargo flows.

The Tri-City area, particularly Gdańsk and Gdynia, is one of Poland’s growing smaller regional markets for modern industrial space. In total, Pomorskie remained the country’s largest regional market outside Poland’s five main warehouse hubs.

At the end of June 2026, 66,000 sq m of modern space was under construction. The vacancy rate stood at 6.3%, in line with the national average.

Warehouses in Gdańsk, Gdynia and the surrounding area serve logistics operators, retail chains, e-commerce businesses, and manufacturing and distribution companies. Among the schemes under development at the end of June, the report highlights 7R Park Gdańsk V, comprising 50,900 sq m. This project accounted for a significant share of the region’s total space under construction.

The above data comes from the AXI IMMO report 'Warehouse Market in Poland H1 2026'.

Top 3 Poland voivodeships net take-up modern warehouse market H1 2026

The most searched phrases