AXI IMMO / Offices / mazowieckie / Warszawa / Śródmieście /
Chmielna 25
Office space for rent in prestigous location in Warsaw
Chmielna 25 is a 7-storey A-class office building with total area of nearly 6000 sq m. Construction of this office building ended in 2013. The characteristic facade distinguishes the office building from the frontage of neighboring buildings and makes it one of the more characteristic buildings in the area. The building was designed by Buland architects. Facade of the building has irregular shape and modernist character. The building consists of 7-storeys above ground, the majority of which is office space –
which occupying 3852 sq m. For tenats use were given 55 parking spaces in underground garage. The office building blends in perfectly with the environment, but allows for unambiguous identification.
Interesting, distinctive architecture Sign characteristic – waving glass facade building The highest quality materials Large lighting of premises Environmental solutions – the building has been certified LEED
Location
The office building located in the very center of Warsaw Chmielna Street is one of the most prestigious places in the capital so the building is surrounded by exclusive shops and numerous service outlets and restaurants Numerous public means of communication, including the subway and the Central Station within a few dozen or a few hundred meters of walking distance
Technical data
-
Number of buildings1
-
Building classA
-
Number of underground levels2
-
Number of ground floors7
-
Space of a typical floor (sq m)800
-
High (m)
-
ReceptionYES
-
BMSYES
-
Heat sensorsYES
-
Smoke detectorsYES
-
Air conditioningYES
-
Open windowsYES
-
Raised floorYES
-
Controlled accessYES
-
Security serviceYES
-
MonitoringYES
-
Two independent power sourcesYES
-
CertificatesYES
-
Close to the metro stationYES
-
Offer IDbb9467
Distances
Market data
In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.
At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.
In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.
Contact
Jakub Potocki
Associate Director Office Department
Contact
Bartosz Oleksak
Associate Director Office Department