Added to comparisons. Check added properties.

9 Mazowiecka Street is a renovated tenement house located in the very center of the city, close to the Saxon Garden. It has 5 floors above ground and over 2,070 sqm of total area. The area of a typical floor is about 400 sqm. The building is distinguished by its renovated facade and decorative window framing. It offers attractive office space in loft style and with above-average height, as well as retail and service premises on the first floor

The high standard of finishes, atmospheric interiors and prestigious neighborhood provide comfortable working conditions. The tenement is located in Warsaw's Śródmieście district, in the center of the vibrant city and close to the main traffic arteries. The National Bank of Poland, the University of Warsaw and the Palace of Culture and Science are in the neighborhood. The location allows you to take full advantage of the capital's retail, service, dining, cultural and hotel offerings

Location

The townhouse is located in Warsaw's Śródmieście district, in the center of the vibrant city and close to the main traffic arteries. The National Bank of Poland, the University of Warsaw and the Palace of Culture and Science are in the neighborhood. The location allows full enjoyment of the capital's retail, service, dining, cultural and hotel offerings. The location allows efficient access to other parts of the city, both by public and private transport. There are numerous bus and streetcar stops nearby, as well as stations of the 1st and 2nd metro lines: Świętokrzyska and Nowy Świat University. It takes about 6 minutes to get by car to the Warsaw Central Railway Station, about 20 minutes to Warsaw Chopin Airport.

Technical data

  • Number of buildings
    1
  • Class Building
    A
  • Subterranean levels
    0
  • Count of ground-level floors
    5
  • Space of ​​a typical floor (sq m)
  • High (m)
    450
  • Welcome Desk
    YES
  • BMS
    YES
  • Heat sensors
    NO
  • Smoke detectors
    YES
  • Air conditioning
    YES
  • Windows wide open
    YES
  • Raised floor
    NO
  • Regulated entry
    YES
  • Security service
    YES
  • Monitoring
    YES
  • Two independent power sources
    NO
  • Certificates
    NO
  • Near the underground station
    YES
  • Parking ratio
    1:70
  • Common area factor
    10%

Market data

In the third quarter of 2023, one new office project was put into operation in Warsaw. It was S-Bridge Office Park A2, which added to the eastern office zone of Warsaw.

At the end of the 3rd quarter, over 240,000 sq m were under construction on the Warsaw market. m2 of modern office space. The greatest developer activity is observed in the Centrum-Zachód office subzone, which is located near Rondo Daszyńskiego. Almost 70% of the newly created office space in Warsaw is built there.

In the third quarter of 2023, the vacancy rate on the Warsaw office market decreased by 0.8 percentage points. compared to the previous quarter, to 10.6%. The lowest availability of office space is in the central zone. The vacancy rate here was 9.1%, while in non-central zones it was 11.8%. The highest vacancy rate was recorded in Służewiec, the lowest in the Center-North subzone.

Vacancy Rates Warsaw Q3 2023
Additional property listings
Additional property listings
Additional property listings

Contact

Bartosz Oleksak

Associate Director, Office Department

Contact

Jakub Potocki

Associate Director, Office Department

contact

The most searched phrases