Added to comparisons. Check added properties.

Topaz office building - Mokotow

Office for rent immediately - multiple sizes of space available

Topaz is a modern office building located in Mokotów District, which offers on its 7-storeys about 10,000 sq m of lettable office space. Parking located on two underground levels provides over 187 parking spaces for tenants use. The building meets all of the requirements associated with a modern office building including: suspended ceiling raised floor, reception, fibre optics or Emergency power supply. The building i also equipped with Building Management System (BMS), which allows for intelligent building control. The property is suitable for both small to large clients with varied requirements. The interior of the building is finished using materials of the highest quality, while the glass facade of the building will provides a steady flow of natural light. In 2006 Topaz won Award of the Minister of Construction.

Topaz is a 9-storey office building, which offers approx. 11,000 m2 of leasing space for tenant’s use. The object provides about 190 underground parking spaces. Typical floor plate is approx. 2,400 m2. The building has obtained the BREEAM certificate with Excellent subtype.

Location

Topaz is located at 39b Domaniewska Street in the Warsaw district Mokotów. Main railway station of the city (PKP Warszawa Centralna) can be easily reached by car within 15 minutes. The International Chopin Airport is situated approx. 20-minutes-drive from the building.

Technical data

  • Number of buildings
    1
  • Building class
    A
  • Number of underground levels
    2
  • Number of ground floors
    7
  • Space of ​​a typical floor (sq m)
    1 780
  • High (m)
  • Reception
    YES
  • BMS
    YES
  • Heat sensors
    YES
  • Smoke detectors
    YES
  • Air conditioning
    YES
  • Open windows
    YES
  • Raised floor
    YES
  • Controlled access
    YES
  • Security service
    YES
  • Monitoring
    YES
  • Two independent power sources
    YES
  • Certificates
    NO
  • Offer ID
    bb9190

Distances

Lotnisko Chopina
Pałac Kultury i Nauki
Galeria Mokotów
Metro Służew

Market data

W 3 kwartale 2023 roku w Warszawie do użytku został oddany jeden nowy projekt biurowy. Był to S-Bridge Office Park A2, który zasilił wschodnią strefę biurową Warszawy.

Na koniec 3 kwartału w budowie na rynku warszawskim pozostawało ponad 240 tys. m2 nowoczesnej powierzchni biurowej. Największą aktywność deweloperów obserwuje się w biurowej podstrefie Centrum-Zachód, która położona jest w okolicy Ronda Daszyńskiego. Tam buduje się niemal 70% nowo powstałej powierzchni biurowej w Warszawie.

W 3 kwartale 2023 roku wskaźnik pustostanów na warszawskim rynku biurowym obniżył się o 0,8 p.p. względem poprzedniego kwartału, do wartości 10,6%. Najmniejsza dostępność powierzchni biurowej występuje w strefie centralnej. Tu wskaźnik pustostanów wyniósł 9,1%, podczas gdy w strefach pozacentralnych kształtował się na poziomie 11,8%. Najwyższy wskaźnik wolnej powierzchni odnotowano na Służewcu, najniższy w podstrefie Centrum-Północ.

Biura Warszawa miasto dane ekonomiczne 3 kwartał 2023
more offers
more offers
more offers

The most searched phrases